Hebei Chengde Yudaokou Windfarm 48MW project
#43of 1084 in China#89of 1459 in CDM (UNFCCC)#105of 1287 in ACM0002
Audit Analysis
A 48 MW onshore wind project in Hebei, China, registered under CDM with a combined additionality test confirmed by TÜV NORD CERT and a jurisdictional grid-emission-factor baseline. The first monitoring period delivered approximately 100% of the pro-rata expectation, indicating no over-crediting. Main concerns are inconsistent leakage justification across documents, several unreported MRV parameters, and the absence of a buffer pool or permanence mechanism.
Red Flags
- Leakage justification is inconsistent: the validation report (2011) states leakage was deemed negligible, while the monitoring report (2012) records it as not addressed, leaving the 0% deduction without a clear, consistent rationale.
- Baseline method is characterised as 'project' in the monitoring report but 'jurisdictional' in the validation report; the jurisdictional reading is consistent with ACM0002 but the discrepancy signals a documentation-quality issue.
- No buffer pool percentage, no reversal-event tracking, and no permanence mechanism are stated in any available document, leaving the permanence risk for a 7-year crediting period unaddressed on paper.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 35,147 | 0 | 35,147 | |
| Total | 35,147 | 0 | 35,147 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, justification inconsistent across docs
Jurisdictional grid EF (2010), ACM0002
Safeguards mentioned, FPIC/grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.