Hebei Chongli Changchengling Wind Farm Project
#557of 1935 in Renewable energy#259of 1084 in China#377of 1459 in CDM (UNFCCC)#427of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a jurisdictional baseline and VVB-confirmed additionality, but the extracted record contains only the 2012 validation report with no verification or monitoring data. The validation identified 14 material findings (corrective actions and clarifications), all of which were addressed before registration, yet the absence of verified emission reduction figures and several key MRV parameters limits confidence in the project's ongoing performance.
Red Flags
- 14 material findings at validation (7 CARs, 7 CLs) indicate the initial PDD had substantial gaps in additionality analysis, IRR calculations, monitoring design, and project boundary definition, all requiring corrective action before registration
- No verified emission reduction data is available in the extracted record; the only ERR figure is the lifetime ex-ante claim of 621,166 tCO2e, with no monitoring-period verification to confirm actual delivery
- No verification or monitoring reports appear in the evidence document list despite the monitoring period ending in November 2019, leaving a multi-year gap in performance evidence
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no reversal risk
0% deemed negligible – reasonable for grid wind
Jurisdictional baseline with specified grid EF
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →