Hebei Fengning Batou Wind Power Project
#558of 1935 in Renewable energy#260of 1084 in China#378of 1459 in CDM (UNFCCC)#428of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Hebei, China, using the standard ACM0002 methodology with a jurisdictional baseline and a 7-year crediting period. The project was validated by CTC with no material findings, but the extracted record lacks additionality test details, verified emission reduction figures, and CORSIA/CCP status, creating moderate evidence gaps. The ERR contradiction between the PDD and validation report is likely explainable by different reporting periods but reduces confidence in the data.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, despite being a mandatory CDM requirement
- Total ERR claimed differs by a factor of ~6.7 between the PDD (631,316) and the validation report (93,786), with no explicit reconciliation in the available documents
- Verified emission reduction figure is not available in the extracted record, preventing independent cross-check of claimed reductions
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 75,209 | 0 | 75,209 | |
| 2013 | 96,260 | 0 | 96,260 | |
| Total | 171,469 | 0 | 171,469 |
Risk Indicators
Test not stated in extracted record
Avoidance project, no reversal risk
Deemed negligible, consistent with wind
Jurisdictional, reassessed 2019
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →