Hebei Fengning Dahexi Wind Power Project
#961of 1935 in Renewable energy#513of 1084 in China#703of 1459 in CDM (UNFCCC)#755of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Hebei, China, with a jurisdictional baseline and a VVB-verified ERR of 93,199 tCO₂e over a 7-year crediting period. The project is low-risk in terms of permanence and leakage, but the extracted record lacks explicit additionality confirmation and shows a significant discrepancy between the PDD (652,393) and the validation report (93,199) on total emissions reductions. Documentation is moderate in completeness with one unidentified source document.
Red Flags
- The PDD (2019-07-23) reports a total ERR of 652,393 tCO₂e while the validation report (2019-07-30) confirms only 93,199 tCO₂e — a roughly 7-fold discrepancy that raises over-crediting concerns if the PDD figure was used in any registration or marketing context.
- Additionality test type and VVB confirmation of additionality are not captured in the extracted record, leaving a gap in verifying a core CDM requirement.
- One of the four source documents is listed as 'unknown' type, reducing confidence in the completeness of the evidence base.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 98,459 | 0 | 98,459 | |
| 2013 | 97,483 | 0 | 97,483 | |
| Total | 195,942 | 0 | 195,942 |
Risk Indicators
Test type not stated in extracted record
Avoidance project, no reversal risk
Deemed negligible, reasonable for wind
Jurisdictional, reassessed 2019
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →