Hebei Fengning Luotuogou 1st Phase Wind Power Project
#559of 1935 in Renewable energy#261of 1084 in China#379of 1459 in CDM (UNFCCC)#429of 1287 in ACM0002
Audit Analysis
A CDM-registered wind power project in Hebei, China, using a jurisdictional baseline and ACM0002 methodology. The project shows no material findings, no corrective actions, and a reasonable 0% leakage deduction for a wind avoidance project. However, several key monitoring and additionality details are absent from the extracted record, and a date inconsistency in the monitoring report raises minor data-reliability questions.
Red Flags
- Monitoring report is dated 2019-07-10 yet the stated monitoring period extends to 2024-02-29, a logical inconsistency that suggests either a data-extraction error or an incomplete verification cycle
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the specific additionality basis unconfirmed
- One of the four evidence documents is listed as 'unknown', reducing confidence in the completeness of the documentary record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 90,396 | 0 | 90,396 | |
| 2013 | 65,814 | 0 | 65,814 | |
| Total | 156,210 | 0 | 156,210 |
Risk Indicators
Test type not stated in extracted record
Wind avoidance project; no reversal risk
0% deduction; negligible for grid-connected wind
Jurisdictional baseline; reassessed 2019
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →