HEBEI HAIXING 49.5MW WIND FARM PROJECT
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB in the validation/verification record.
missing Baseline and key quantification inputs show material inconsistencies across documents (grid factor, crediting period, ER totals), undermining baseline validity.
Transparency
verified VVB is identified (Applus+ Certification) and monitoring period is clearly stated (2021-11-26 to 2022-05-25) in the monitoring report (2022).
missing Reported ER numbers and key parameters conflict across documents, reducing MRV clarity and traceability.
Claim Safety
missing Over-crediting risk is elevated due to contradictory ER totals and grid emission factors across validation/monitoring documents.
inferred CORSIA eligibility and CCP status were not found in the extracted record, leaving double-claim/eligibility risk unresolved.
Documentation
verified A relatively complete document set is referenced (PDD, monitoring report, validation report, issuance) with 16 documents used and high extraction confidence.
missing Internal inconsistencies between documents indicate documentation quality/control issues despite apparent completeness.
Detailed Analysis
Integrity
The project applies ACM0002 (version 20.0) and is an avoidance-type renewable energy activity, which generally has low permanence risk; no reversal events were found in the extracted record. Additionality is confirmed by the VVB per the validation/verification record, but the specific additionality test type was not found in the extracted record. Integrity is weakened by baseline/quantification instability: the monitoring report (2022) uses a grid emission factor of 0.84045 while an earlier validation report (2020) shows 1.0205, and the crediting period start date differs between documents (monitoring report 2022 vs validation report 2022). Leakage is recorded as a 0% deduction, but the monitoring report (2022) does not address leakage justification, creating an evidence gap.
Transparency
The monitoring period is clearly stated in the monitoring report (2022-12-15) as 2021-11-26 to 2022-05-25, and the VVB is named as LGAI Technological Center, S.A. (Applus+ Certification). However, transparency is reduced by conflicting ER figures across documents, making it difficult to reconcile what was claimed versus what was verified. The extracted record shows no material findings and no corrective actions required, which supports audit clarity, but the contradictions suggest underlying MRV traceability issues.
Claim Safety
Claim safety is constrained by over-crediting risk signals: the validation/monitoring documents disagree on total emission reductions (e.g., 372,460 vs 666,905 claimed in different documents, and 50,898 vs 372,460 presented as verified in different validation reports). The grid emission factor discrepancy (0.84045 in the monitoring report 2022 vs 1.0205 in the validation report 2020) further increases the risk that credited reductions are sensitive to parameter choice. CORSIA eligibility and CCP status were not found in the extracted record, so eligibility-based claim constraints cannot be confirmed.
Documentation
The extracted record indicates a reasonably complete documentation trail (PDD, monitoring report, validation report, issuance) and a relatively large set of documents used (16), with high extraction confidence. Safeguards are at least partially documented: FPIC is indicated and a grievance mechanism is indicated, and benefit sharing is described. Despite this, documentation quality is undermined by multiple internal inconsistencies across official documents (ER totals, grid factor, crediting period, and leakage treatment), suggesting version control or reporting errors.
Overall
Overall quality is moderate but penalized heavily for contradictions that affect credit quantification and eligibility. For total emission reductions, the monitoring report (2020-03-17) value of 666,905 is privileged as the higher-risk indicator for claimed volume because it implies greater potential over-crediting than 372,460 in the validation report (2022-02-08). For verified ERs, the lower value (50,898) is privileged because it is more conservative than 372,460 and aligns with a single monitoring period (2021-11-26 to 2022-05-25) stated in the monitoring report (2022-12-15). For the grid emission factor, the more recent monitoring report (2022) value of 0.84045 is privileged over the 2020 validation value, but the discrepancy itself reduces confidence. For the crediting period, the monitoring report (2022) start date of 2008 is privileged as it is more specific to the project’s stated crediting window, yet the conflicting 2018 start date in the validation report (2022) remains a significant eligibility/volume red flag.
Audit Analysis
This is a VCS wind project using ACM0002 with VVB involvement and no reported material findings, but key quantitative elements are inconsistent across documents. Large discrepancies in credited/verified emission reductions, grid emission factor, and even the crediting period increase over-crediting and reliability risk. Safeguards elements (FPIC and grievance mechanism) are mentioned, supporting social risk management, but leakage treatment is unclear and inconsistent.
Project Description
The objective of Hebei Haixing 49.5MW Wind Farm Project is to generate renewable electricity using wind power resources and to sell the generated output to the Hebei Southern Power Grid. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emissions from electricity generation by fossil fuel power plants that supply the Hebei Southern Power Grid, which is an integral part of the North China Power Grid.
Red Flags
- Major inconsistencies in emission reductions across documents (claimed and verified figures differ by an order of magnitude in places), raising over-crediting and data reliability risk.
- Grid emission factor differs materially between documents (0.84045 vs 1.0205), which can significantly change credited reductions.
- Crediting period start date is inconsistent (2008 vs 2018), creating uncertainty about eligibility and volume of credits.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 54,856 | 54,856 | 0 | |
| 2013 | 238,188 | 230,835 | 7,353 | |
| 2014 | 127,560 | 103,750 | 23,810 | |
| 2015 | 87,655 | 14,896 | 72,759 | |
| 2016 | 126,671 | 82,338 | 44,333 | |
| 2017 | 47,771 | 44,298 | 3,473 | |
| 2018 | 165,702 | 61,168 | 104,534 | |
| 2019 | 108,788 | 83,117 | 25,671 | |
| 2020 | 97,970 | 21,594 | 76,376 | |
| 2021 | 10,821 | 10,819 | 2 | |
| 2022 | 40,077 | 39,456 | 621 | |
| Total | 1,106,059 | 747,127 | 358,932 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled ER table (by monitoring period) that clearly distinguishes ex-ante estimates, monitored ERs, and issued/verified ERs, with consistent references to the same grid emission factor source and year.
- Clarify and correct the crediting period start date across all public documents and registry entries, and provide an explicit leakage assessment consistent between the validation and monitoring reports.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality (test type not specified)
Avoidance project; no reversals found
0% leakage but justification inconsistent/missing
Project-specific baseline; reassessment timing unclear
FPIC and grievance mechanism indicated
CORSIA/CCP status not found in extracted record
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
validation
- DX_2220 VCS-Verification-Representation-v4.0.pdf
- VCS-Verification-Representation-v4.1 VCS414.pdf
- VCS-Verification-Representation-v4.1.pdf
- A+SH_SYST_07822 Vcs VerificationReport Clean.pdf
- 414_VCS-Verification-Report- Hebei Haixing 49.5MW Wind Farm Project-VCS414- CTI-clean.pdf
- VCS-Verification-Report-Template Haixing_AR.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →