Hebei Shangyi CGN Dongshan Wind Power Project
#1032of 1935 in Renewable energy#571of 1084 in China#768of 1459 in CDM (UNFCCC)#813of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and no material findings, but significant gaps in extracted data including additionality test details, monitoring records, and safeguards documentation. The low extraction confidence and absence of monitoring reports limit confidence in the project's ongoing performance. The inherent low permanence risk of wind generation and the jurisdictional baseline are strong positives.
Red Flags
- Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality assessment unverifiable from the extracted record
- No monitoring reports appear in the evidence set despite the crediting period running from January 2020 to December 2026, making ongoing performance unverifiable
- Low extraction confidence across documents suggests key data may have been missed or documents were poorly readable
- Contradiction between documents on leakage treatment: the validation report (2020-06-29) states leakage is deemed negligible, while an earlier document (2020-06-18) references a quantified approach
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 446,425 | 0 | 446,425 | |
| Total | 446,425 | 0 | 446,425 |
Risk Indicators
Test type not stated in available records
Wind generation — no reversal risk
0% deduction, deemed negligible (appropriate for wind)
Jurisdictional baseline, reassessed 2020
Safeguards mentioned, FPIC and grievance mechanism not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →