Hebei Shangyi Chaoligai 49.5MW Wind Farm Project
#1379of 1935 in Renewable energy#839of 1084 in China#1113of 1459 in CDM (UNFCCC)#1063of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Hebei, China, validated under CDM with a jurisdictional baseline and VVB-confirmed combined additionality test. However, the available record is limited to the validation stage: no monitoring reports, no verified emissions, and a significant discrepancy between the PDD and validation report on total emissions reductions (a factor-of-seven gap). Twelve material findings and fourteen corrective actions at validation indicate substantial documentation and calculation issues that were addressed before registration, but the absence of post-validation data prevents any assessment of actual delivery.
Red Flags
- Total ERR in the PDD (733,852 tCO₂e) is exactly seven times the figure in the validation report (104,836 tCO₂e), suggesting the PDD stated the lifetime total while the VVB reported an annual figure — a material documentation inconsistency that undermines confidence in the claimed credit volume.
- Twelve material findings (six CARs, six CLs) at validation, including incorrect financial parameters, missing baseline parameters, and non-compliant monitoring plan, indicate the PDD required substantial revision before registration.
- No monitoring reports or verified emissions data are present in the extracted record, making it impossible to confirm whether the project actually delivered the claimed reductions during its 2013–2019 crediting period.
- Leakage treatment is inconsistent across documents: the validation report states leakage was 'deemed negligible' while an appendix references a 'quantified' approach, with no clear reconciliation.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, justification inconsistent across docs
Jurisdictional, 2011 grid EF
Safeguards mentioned, FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →