Audit Analysis
A CDM wind farm project in China with a solid additionality case (IRR below benchmark without CDM revenues) and inherent permanence as an avoidance project. However, a significant discrepancy between the PDD's claimed 698,999 tCO2e and the validation report's verified 99,857 tCO2e raises data-reliability concerns, and several key monitoring and safeguards fields are absent from the extracted record.
Red Flags
- The PDD claims 698,999 tCO2e over the crediting period while the validation report verifies only 99,857 tCO2e — a roughly 7-fold discrepancy that, although resolved in favour of the lower VVB-verified figure, signals a weak initial quantification and raises over-crediting risk in the project's own documentation.
- Leakage justification is contradictory: the validation report (2011) states leakage was 'deemed negligible' while the monitoring report (2014) describes it as 'quantified,' yet the deduction in both cases is 0%.
- No verified ER figure (total_err_verified) was found in any available document, leaving the actual delivered credits unconfirmed in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 99,539 | 0 | 99,539 | |
| 2014 | 168,733 | 0 | 168,733 | |
| Total | 268,272 | 0 | 268,272 |
Risk Indicators
VVB-confirmed investment test; IRR below benchmark without C
Avoidance project (wind); no inherent reversal risk
0% deduction with contradictory justification across documen
Jurisdictional grid EF used; method label inconsistent betwe
Safeguards mentioned and benefit sharing described; FPIC and
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →