Hebei Shangyi Qijiashan Wind Farm Project
#859of 1935 in Renewable energy#448of 1084 in China#613of 1459 in CDM (UNFCCC)#673of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with VVB-confirmed additionality and a jurisdictional baseline, but undermined by eight corrective actions, five material findings, and four cross-document contradictions. The project is conservative in its claims (verified ERR exceeds claimed ERR), yet the 2006 grid emission factor and inconsistent leakage treatment across documents introduce moderate over-crediting risk. Documentation is adequate in volume but weak in internal consistency.
Red Flags
- Eight corrective actions (CARs) were required by the VVB, including missing Letters of Acceptance from both China's and the UK's DNAs, indicating significant procedural gaps at verification time
- Grid emission factor of 1.0548 tCO2/MWh is drawn from 2006 data, nearly seven years before the monitoring period, raising the risk of over-estimating baseline emissions as China's grid decarbonised
- The verification report is dated 2013-01-11, which falls within the stated monitoring period (2012-05-01 to 2013-04-30), creating a sequencing anomaly that undermines confidence in the verification timeline
- Crediting period differs between the PDD (2009-10-01 to 2016-10-01) and the verification report (2010-08-06 to 2017-08-05), with no documented explanation for the shift
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 304,833 | 0 | 304,833 | |
| 2013 | 615,172 | 0 | 615,172 | |
| Total | 920,005 | 0 | 920,005 |
Risk Indicators
VVB-confirmed combined test
Wind avoidance, no reversal risk
0% deduction, inconsistent across docs
Jurisdictional but 2006 grid EF, method disputed
Mentioned, benefit sharing present, FPIC/grievance not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →