Hebei Shiren II Wind Power Project
#507of 1935 in Renewable energy#214of 1084 in China#333of 1459 in CDM (UNFCCC)#380of 1287 in ACM0002
Audit Analysis
The Hebei Shiren II Wind Power Project is a CDM-registered wind avoidance project with VVB-confirmed additionality and a reasonable zero-leakage claim, but it suffers from a fixed 2009 grid emission factor that has not been updated, a missing verified ERR figure, and several unresolved documentation gaps. The project is fundamentally sound in design but lacks the monitoring depth and baseline currency expected of a high-quality credit.
Red Flags
- Grid emission factor fixed at the 2009 value (0.9502 tCO₂/MWh) with no evidence of periodic updating, creating over-crediting risk as China's grid decarbonises
- Verified ERR figure is absent from the extracted record, making it impossible to confirm actual delivery against the 36,238 tCO₂ lifetime claim
- Contradiction in baseline method between the PDD (jurisdictional) and the 2013 monitoring report (project-specific) undermines confidence in the baseline construction
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 49,299 | 0 | 49,299 | |
| 2013 | 36,238 | 0 | 36,238 | |
| Total | 85,537 | 0 | 85,537 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% with quantified justification
Grid EF fixed at 2009 value, not updated
Safeguards mentioned, FPIC/grievance unstated
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →