Hebei Shirenshan Wind Power Project
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB (validation/verification documentation referenced in the record).
missing Leakage treatment is not addressed in the extracted record and baseline reassessment timing is not stated.
Transparency
verified Verified emission reductions are stated (614,637 tCO₂e) and the monitoring period is clearly defined (monitoring report dated 2022-08-06).
missing Total ERs claimed are not found in the extracted record, limiting cross-checking of claimed vs verified figures.
Claim Safety
verified Uses an established grid-connected renewable methodology (ACM0002 v06), which generally has standardized MRV expectations.
missing CORSIA eligibility and CCP status are not stated in the extracted record, and leakage treatment is not addressed, raising buyer claim and over-crediting risk.
Documentation
verified Multiple core document types are referenced (validation report, monitoring report, issuance) with high extraction confidence.
inferred One evidence document is listed as unknown, and some key quantifications (e.g., claimed ERs, leakage deduction) are missing from the extracted record.
Detailed Analysis
Integrity
The extracted record indicates additionality was confirmed by the VVB, which supports additionality robustness for a grid-connected wind project. The baseline is described as project-specific, and the timing of any baseline reassessment is not stated in available documents, which weakens confidence over a long crediting period (2008-02-18 to 2018-02-17). Leakage is explicitly not addressed in the extracted record and no leakage deduction is stated, creating an integrity gap even if leakage is likely low for wind.
Transparency
The monitoring report (dated 2022-08-06) provides a clearly bounded monitoring period (2012-05-01 to 2018-02-17) and reports verified ERs of 614,637 tCO₂e, which supports traceability. The VVB is identified as China Classification Society Certification Co., Ltd., improving audit transparency. However, total ERs claimed are not found in the extracted record, reducing the ability to reconcile claimed versus verified outcomes.
Claim Safety
The project applies ACM0002 (version 06), a widely used methodology for grid-connected renewable electricity, which generally reduces methodological ambiguity. That said, the extracted record does not state CORSIA eligibility or CCP status, so downstream claims (e.g., CORSIA-aligned or CCP-aligned) cannot be safely inferred. In addition, leakage is not addressed in the extracted record, which increases perceived over-crediting/quality risk for buyers even if practical leakage is minimal.
Documentation
The evidence set includes key document types (validation report, monitoring report, issuance) and the minimum extraction confidence is high, indicating the underlying documents were readable and usable. No material findings or corrective actions are reported in the extracted record, which is consistent with a clean assurance outcome. Some important fields remain missing (e.g., total ERs claimed, leakage deduction), and one evidence document is categorized as unknown, preventing a higher documentation score.
Overall
No contradictions were identified in the extracted record, so scores are not discounted for internal inconsistencies. The overall score balances solid third-party assurance signals (named VVB, verified ERs, no reported findings) against quality gaps that matter for credit integrity and buyer risk (project-specific baseline with no reassessment timing stated, and leakage not addressed). If documentation were to fall below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, the overall would be capped at 6.0—neither gate is triggered by these scores.
Audit Analysis
This VCS wind project is supported by a VVB-confirmed additionality conclusion and a clear monitoring period with verified ERs. However, baseline setting is project-specific with no documented reassessment timing, and leakage treatment is not addressed in the extracted record, which increases over-crediting uncertainty.
Project Description
Proponent: Longyuan (Zhangjiakou) Wind Power Co., Ltd. Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 122445 tCO2e Region: Asia Registration date: 2020-04-06
Red Flags
- Leakage is not addressed in the extracted record (no justification and no stated deduction), despite being a required element of MRV completeness.
- Baseline approach is project-specific and the timing of any baseline reassessment is not stated, increasing baseline robustness risk over a long crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 79,435 | 79,435 | 0 | |
| 2012 | 71,984 | 0 | 71,984 | |
| 2013 | 128,132 | 0 | 128,132 | |
| 2014 | 122,086 | 0 | 122,086 | |
| 2017 | 103,975 | 0 | 103,975 | |
| Total | 505,612 | 79,435 | 426,177 |
Cosa migliorerebbe questo punteggio
- Disclose and/or extract the explicit leakage assessment and any leakage deduction (even if 0%) from the monitoring/verification documentation, with a clear justification.
- Provide the additionality test type and any baseline reassessment details (including the grid EF vintage/year used) to strengthen baseline credibility and buyer confidence.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal risk indicated for wind
Leakage not addressed in record
Project-specific baseline; reassessment timing unclear
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →