Hebei Wanquan Yulong Wind Power Project
#963of 1935 in Renewable energy#517of 1084 in China#706of 1459 in CDM (UNFCCC)#757of 1287 in ACM0002
Audit Analysis
A CDM wind project validated by Lloyd's Register with a confirmed combined additionality test and no inherent reversal risk, but undermined by seven material findings at validation, a 0% leakage deduction with no explicit justification in the most recent monitoring report, and a significant internal contradiction in reported emission reduction figures. The absence of verified ERR data and the use of a 2005 grid emission factor for a project running through 2016 introduce moderate over-crediting risk.
Red Flags
- Seven material findings (CARs) at validation including emission factor errors, unaddressed electricity imports from the Northeast China Grid, backup power calculation ambiguity, and operational life inconsistency with the FSR
- Contradiction within the same 2016 monitoring report: total ERR stated as both 302,563 and 31,394, creating uncertainty about the actual credit volume
- Leakage justification recorded as 'not addressed' in the 2016 monitoring report, contradicting the 2012 report which stated it was quantified
- Total verified ERR figure is not stated in any available document, preventing independent verification of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 45,143 | 0 | 45,143 | |
| 2012 | 171,883 | 0 | 171,883 | |
| 2013 | 37,788 | 0 | 37,788 | |
| 2016 | 302,563 | 0 | 302,563 | |
| Total | 557,377 | 0 | 557,377 |
Risk Indicators
Combined test confirmed by Lloyd's Register
Wind avoidance – no reversal risk
0% deduction, justification not addressed in 2016 report
ACM0002 grid EF (2005); method described inconsistently acro
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →