5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A CDM wind project validated by Lloyd's Register with a confirmed combined additionality test and no inherent reversal risk, but undermined by seven material findings at validation, a 0% leakage deduction with no explicit justification in the most recent monitoring report, and a significant internal contradiction in reported emission reduction figures. The absence of verified ERR data and the use of a 2005 grid emission factor for a project running through 2016 introduce moderate over-crediting risk.

Red Flags

  • Seven material findings (CARs) at validation including emission factor errors, unaddressed electricity imports from the Northeast China Grid, backup power calculation ambiguity, and operational life inconsistency with the FSR
  • Contradiction within the same 2016 monitoring report: total ERR stated as both 302,563 and 31,394, creating uncertainty about the actual credit volume
  • Leakage justification recorded as 'not addressed' in the 2016 monitoring report, contradicting the 2012 report which stated it was quantified
  • Total verified ERR figure is not stated in any available document, preventing independent verification of claimed reductions

Credit Vintages

IssuedRetiredAvailable
2010
45,143045,143
2012
171,8830171,883
2013
37,788037,788
2016
302,5630302,563
Total557,3770557,377

Risk Indicators

Additionality

Combined test confirmed by Lloyd's Register

Permanence

Wind avoidance – no reversal risk

Leakage

0% deduction, justification not addressed in 2016 report

Baseline

ACM0002 grid EF (2005); method described inconsistently acro

Safeguards

Safeguards and benefit-sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002 Consolidated baseline methodology for grid-connected electricity generation from renewable sources

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents