Hebei Weichang Longyuan Construction Investment Shanwanzi Wind Power Project
#185of 1935 in Renewable energy#59of 1084 in China#112of 1459 in CDM (UNFCCC)#130of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with VVB-confirmed additionality (combined test by DNV) and an appropriate jurisdictional grid baseline, but several key operational data points remain unreported. The project shows no material findings or corrective actions, and the inherent low-risk nature of wind displacement is a positive, though data gaps in verified ERR, buffer pool, and safeguards documentation limit confidence.
Red Flags
- Baseline method is described as 'project' in the 2013 monitoring report but 'jurisdictional' in the 2009 validation report — an inconsistency that, while likely a terminology difference, undermines baseline clarity
- Leakage justification is stated as 'quantified' in the monitoring report but 'not addressed' in the validation report, creating ambiguity about whether leakage was genuinely assessed at project inception
- Total ERR verified figure is not reported in any available document, preventing independent cross-check of claimed credits
- One of the 11 evidence documents is classified as 'unknown' type, reducing traceability of the evidence base
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 139,175 | 0 | 139,175 | |
| 2012 | 107,783 | 0 | 107,783 | |
| 2013 | 115,676 | 0 | 115,676 | |
| Total | 362,634 | 0 | 362,634 |
Risk Indicators
Combined test confirmed by DNV
mixed evidence / unresolved risk
0% deduction; justification inconsistent across docs
Grid EF appropriate but method label contradicts
Safeguards mentioned; FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →