Hebei Xiqiaoliang Farm Phase I Project
#627of 1084 in China#851of 1459 in CDM (UNFCCC)#871of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in Hebei, China, with a jurisdictional baseline and a 7-year crediting period. The project shows no material findings or corrective actions, but the extracted record lacks explicit additionality confirmation and contains a significant discrepancy between the PDD and validation report on total emission reductions (621,320 vs 88,760 tCO₂e), which undermines confidence in the claimed credit volume.
Red Flags
- The PDD (2019-07-23) reports a total ERR of 621,320 tCO₂e while the validation report (2019-07-30) confirms only 88,760 tCO₂e — a roughly 7-fold discrepancy that is not explained in the available documents.
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the core CDM additionality requirement unverified in the available evidence.
- No buffer pool percentage is stated, and while wind is an avoidance project, the absence of any permanence or reversal-risk discussion in the documents is a documentation gap.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 88,482 | 0 | 88,482 | |
| Total | 88,482 | 0 | 88,482 |
Risk Indicators
Not confirmed in extracted record
Avoidance project, no reversal risk
Negligible, consistent with wind
Jurisdictional, reassessed 2019
Mentioned but details absent
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →