Skip to main content
CDMWindChinaACM0002

Hebei Xiqiaoliang Farm Phase I Project

CDM-5064 ↗

#627of 1084 in China#851of 1459 in CDM (UNFCCC)#871of 1287 in ACM0002

5.0/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

A CDM wind energy project in Hebei, China, with a jurisdictional baseline and a 7-year crediting period. The project shows no material findings or corrective actions, but the extracted record lacks explicit additionality confirmation and contains a significant discrepancy between the PDD and validation report on total emission reductions (621,320 vs 88,760 tCO₂e), which undermines confidence in the claimed credit volume.

Red Flags

  • The PDD (2019-07-23) reports a total ERR of 621,320 tCO₂e while the validation report (2019-07-30) confirms only 88,760 tCO₂e — a roughly 7-fold discrepancy that is not explained in the available documents.
  • Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the core CDM additionality requirement unverified in the available evidence.
  • No buffer pool percentage is stated, and while wind is an avoidance project, the absence of any permanence or reversal-risk discussion in the documents is a documentation gap.

Credit Vintages

IssuedRetiredAvailable
2013
88,482088,482
Total88,482088,482

Risk Indicators

Additionality

Not confirmed in extracted record

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, consistent with wind

Baseline

Jurisdictional, reassessed 2019

Safeguards

Mentioned but details absent

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents