Hebei Zhangbei Baimiaotan Wind Power Project Phase II
#378of 1935 in Renewable energy#149of 1084 in China#245of 1459 in CDM (UNFCCC)#283of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with VVB-confirmed additionality and inherently low permanence risk, but undermined by four cross-document contradictions (baseline method, leakage justification, crediting period, and ERR figures) and a material finding about a shared transformer with another CDM project. The monitoring period shows under-delivery relative to the pro-rata expectation, which is conservative, but the absence of a buffer pool, a 0% leakage deduction with inconsistent justification, and several unverified safety fields (CCP, CORSIA, FNRB) limit confidence.
Red Flags
- Material finding: shared main transformer and transmission line with another CDM project, requiring a revised distribution method for net generation — risk of double-counting between the two projects.
- Baseline method is characterised as 'project' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the baseline basis.
- Leakage justification is contradictory: the validation report deems leakage negligible, while the monitoring report does not address leakage at all, yet a 0% deduction is applied.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified despite the absence of reversal events.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 52,462 | 0 | 52,462 | |
| Total | 52,462 | 0 | 52,462 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% deduction, contradictory justification
Method label contradicts across docs
Mentioned but FPIC/grievance not stated
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →