Skip to main content
CDMWindChinaACM0002

Hebei Zhangbei Lijiaying Wind Farm Project

CDM-5285 ↗

#146of 1935 in Renewable energy#44of 1084 in China#90of 1459 in CDM (UNFCCC)#106of 1287 in ACM0002

6.5/ 10
Integrity
7.0
Transparency
5.5
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A CDM wind project with VVB-confirmed additionality and inherent permanence (no reversal risk), but with a notable contradiction in baseline characterization between the 2011 validation report (jurisdictional) and the 2021 monitoring report (project-specific). Several key transparency fields remain unreported, and the absence of a verified ERR figure limits confidence in delivery tracking.

Red Flags

  • Baseline method is characterized as 'project' in the 2021 monitoring report but 'jurisdictional' in the 2011 validation report — a material inconsistency that weakens baseline robustness
  • Total verified ERR is not reported in any available document, leaving delivery performance unconfirmed
  • Grid emission factor is from 2010 and no reassessment or update is documented for the full crediting period

Credit Vintages

IssuedRetiredAvailable
2013
98,514098,514
2015
287,7860287,786
2022
334,0530334,053
Total720,3530720,353

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind displacement, no reversal risk

Leakage

0% deduction, justified for grid feed-in

Baseline

Project vs jurisdictional contradiction

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents