Heilongjiang Dabaishan Wind Power Project

CDM-5784 ↗

#618of 1935 in Renewable energy#298of 1084 in China#426of 1459 in CDM (UNFCCC)#476of 1287 in ACM0002

5.6/ 10
Integrity
5.8
Transparency
5.5
Claim Safety
5.2
Documentation
6.0

Audit Analysis

A CDM wind power project in China with VVB-verified additionality, but the validation report reveals the project IRR (7.24%) falls below the 8% benchmark and the common practice analysis was incomplete, raising meaningful additionality concerns. Multiple contradictions across documents (baseline method, leakage justification, crediting period) reduce confidence in the data record. The project delivered roughly 74% of its pro-rata emission reduction expectation for the first monitoring period.

Red Flags

  • Project IRR without CDM revenues is 7.24%, below the 8% benchmark threshold cited in the validation report, undermining the investment additionality case
  • Common practice analysis identified only two similar projects and excluded both due to special financing/tax privileges, leaving the analysis effectively empty
  • Four corrective actions were required by the VVB, including updating additionality tools, clarifying monitoring procedures, correcting tariff figures, and completing the common practice analysis
  • Baseline method is contradictory: the validation report describes a jurisdictional baseline while the monitoring report references a project-specific baseline

Credit Vintages

IssuedRetiredAvailable
2013
73,829073,829
Total73,829073,829

Risk Indicators

Additionality

VVB-verified but IRR below benchmark, common practice incomp

Permanence

Wind avoidance project, no reversal risk

Leakage

0% deduction, contradictory justification across documents

Baseline

Method contradictory; grid EF from 2010; reassessment not ye

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents