Heilongjiang Daqing Lvsecaoyuan Wind Power Project
#1546of 1935 in Renewable energy#995of 1084 in China#1339of 1459 in CDM (UNFCCC)#1179of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a VVB-confirmed additionality assessment and a jurisdictional grid-emission-factor baseline, but the available record is limited to a 2012 validation report with no monitoring data. Two significant numerical contradictions between the PDD and the validation report (a seven-fold gap in total ERR and a 12% gap in the grid emission factor) undermine confidence in the credit quantity, and eight material findings at validation—including one corrective action for missing Letters of Approval—signal a less-than-clean approval process.
Red Flags
- Total ERR differs by a factor of ~7 between the PDD (695,422 tCO₂e) and the validation report (99,346 tCO₂e); the basis for this discrepancy is not explained in the extracted record
- Grid emission factor is 0.96357 in the validation report but 1.085 in an earlier appendix, a 12% difference that directly affects credit quantity
- Eight material findings at validation, including one corrective action (missing Letters of Approval from the host country and an Annex I Party)
- No monitoring reports or verified ERR figures are available in the extracted record, so actual delivery cannot be assessed
- Low extraction confidence across the document set, with one source listed as 'unknown'
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for grid wind
Jurisdictional grid EF, 2012 vintage, no reassessment data
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →