Skip to main content
CDMWindChinaACM0002

Heilongjiang Daqing Ruihao Wind Farm Project

CDM-8590 ↗

#509of 1935 in Renewable energy#217of 1084 in China#335of 1459 in CDM (UNFCCC)#382of 1287 in ACM0002

5.8/ 10
Integrity
7.5
Transparency
4.0
Claim Safety
7.0
Documentation
3.0

Audit Analysis

A CDM wind farm project with a solid additionality case (combined investment and common-practice test confirmed by BVCH, IRR of 6.92% below the 8% benchmark) and a standard jurisdictional grid-emission-factor baseline. However, the available record contains only a validation report and PDD with no monitoring or verification reports, low extraction confidence, and no verified emission-reduction figures, limiting confidence in actual delivery.

Red Flags

  • No monitoring or verification reports found in the extracted record; total verified emissions reductions are not stated, so actual delivery cannot be confirmed
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted data
  • The PDD (Nov 2012) reports a total of 733,740 tCO2 while the validation report (Nov 2012) reports 104,820 tCO2; although the ratio (≈7×) is consistent with a 7-year crediting period, the discrepancy in reporting basis was not explicitly reconciled in the documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test, IRR below benchmark

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, consistent with wind

Baseline

Jurisdictional grid EF, standard for wind

Safeguards

Mentioned and benefit sharing described, but FPIC and grieva

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents