Heilongjiang Fuyuan Wind Power Project

CDM-5487 ↗

#619of 1935 in Renewable energy#299of 1084 in China#427of 1459 in CDM (UNFCCC)#477of 1287 in ACM0002

5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A CDM wind power project verified by DNV KEMA with a combined additionality test and conservative tariff assumptions, but undermined by four cross-document contradictions (leakage justification, additionality type, baseline method, crediting period), a meter accuracy discrepancy, and the absence of a verified ERR figure. The IRR of 7.56% falling below the 8% benchmark actually supports additionality, yet the unresolved contradictions and missing monitoring data limit confidence in the credit's integrity.

Red Flags

  • Four contradictions across documents on leakage justification, additionality test type, baseline method, and crediting period dates create material uncertainty about which values are authoritative
  • Meter accuracy (0.5S) in the monitoring report is inconsistent with the registered PDD value (0.2S), requiring a conservative ±0.3% deduction
  • Total verified ERR is not found in the extracted record, preventing independent confirmation of credit issuance against the 512,624 tCO₂e lifetime claim
  • Three corrective actions were required, including updating the PDD additionality tools and clarifying the net electricity generation monitoring procedure

Credit Vintages

IssuedRetiredAvailable
2013
74,142074,142
Total74,142074,142

Risk Indicators

Additionality

VVB-confirmed combined test; IRR below benchmark

Permanence

Avoidance project; no reversal events reported

Leakage

0% deduction; justification contradictory across documents

Baseline

Method contradictory (project vs jurisdictional); grid EF fr

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents