Heilongjiang Halahai Wind Farm Project
#1118of 1935 in Renewable energy#629of 1084 in China#853of 1459 in CDM (UNFCCC)#873of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a jurisdictional baseline and a named VVB (CTI), but the extracted record shows significant gaps in additionality verification, monitoring details, and safeguards documentation. The ERR figures in the PDD and validation report are internally consistent on an annual-versus-lifetime basis, and the project type carries inherently low permanence risk. Low extraction confidence and a minor material finding temper confidence in the overall documentation quality.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record; for a CDM project this is a core requirement and its absence (or extraction failure) is a material gap.
- Contradiction in leakage justification: the validation report (Oct 2020) states 'deemed negligible' while another source references a 'quantified' treatment; the basis for the 0% deduction is therefore ambiguous.
- Low extraction confidence across the document set means several key fields (monitoring period, FNRB, usage monitoring, CORSIA/CCP status) could not be confirmed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type and VVB confirmation not found in extracted record
Wind avoidance project; no reversal risk
0% deduction; justification contradicted across documents
Jurisdictional grid EF (0.9139, 2017); reassessed 2020
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →