Heilongjiang Huanan Hengdaishan East Wind Power Project
#234of 1935 in Renewable energy#84of 1084 in China#142of 1459 in CDM (UNFCCC)#173of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a VVB-confirmed combined additionality test and a financially verified IRR below benchmark, but weakened by an outdated 2006 grid emission factor, a contradiction in baseline method between the PDD and monitoring reports, and a 0% leakage deduction that lacks any stated justification. The project is inherently low-risk (wind displacing grid electricity), yet several transparency and documentation gaps prevent a higher rating.
Red Flags
- Grid emission factor of 1.1461 tCO2/MWh is from 2006, nearly a decade before the monitoring period, risking over-estimation of avoided emissions as China's grid decarbonised.
- Leakage deduction is 0% with the justification recorded as 'not addressed' in the 2012 monitoring report, despite the 2010 report having described it as 'quantified' — an inconsistency that undermines the leakage analysis.
- Baseline method is described as 'project-specific' in the 2012 monitoring report but 'jurisdictional' in the PDD, creating ambiguity about which baseline was actually applied.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified even though wind projects carry minimal reversal risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 53,412 | 0 | 53,412 | |
| 2012 | 120,396 | 0 | 120,396 | |
| Total | 173,808 | 0 | 173,808 |
Risk Indicators
VVB-confirmed combined test; IRR below benchmark
Wind avoidance; no reversal events reported
0% deduction, justification not addressed in latest MR
Method contradiction; grid EF from 2006 is stale
Safeguards mentioned, benefit sharing described; FPIC and gr
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →