Skip to main content
CDMWindChinaACM0002

Heilongjiang Jixian Taiyangshan Wind Power Project

CDM-6561 ↗

#1320of 1935 in Renewable energy#799of 1084 in China#1047of 1459 in CDM (UNFCCC)#1024of 1287 in ACM0002

4.7/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
6.0
Documentation
3.5

Audit Analysis

A CDM wind power project in China with a jurisdictional baseline and appropriate leakage treatment, but significant gaps in the extracted record including unconfirmed additionality testing, missing monitoring period details, and low document extraction confidence. The ERR figures in the PDD and validation report are consistent on a pro-rata basis (104,477 × 7 = 731,339), indicating no over-crediting concern. Overall a moderate-quality project with adequate design but limited verifiable evidence in the available documents.

Red Flags

  • Additionality test type and VVB verification status are not stated in the extracted record, leaving a core CDM requirement unconfirmed
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and critical details may be missing
  • Monitoring period is not stated in any available document, limiting ability to verify MRV compliance
  • One of the four evidence documents is listed as 'unknown', reducing confidence in the documentation set

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

Avoidance project (wind)

Leakage

Deemed negligible with justification; appropriate for grid-c

Baseline

Jurisdictional baseline, 2019 grid EF, reassessed 2019

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents