Skip to main content
CDMWindChinaACM0002

Heilongjiang Keshanshuguang Wind Power Project

CDM-6431 ↗

#776of 1935 in Renewable energy#388of 1084 in China#554of 1459 in CDM (UNFCCC)#605of 1287 in ACM0002

5.4/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A CDM wind power project in Heilongjiang, China, with a well-structured design: combined additionality test confirmed by DNV, a jurisdictional grid-emission-factor baseline, and a reasonable negligible-leakage justification. However, the available record contains only validation-era documents (2012) with no monitoring reports, no verified emission-reduction figures, and no CORSIA or CCP eligibility data, leaving the project's actual performance and market positioning unverified.

Red Flags

  • No monitoring reports or verified emission-reduction figures are present in the extracted record, so actual performance over the 2012–2019 crediting period cannot be confirmed.
  • The total emission-reduction figure differs between the validation report (107,079 tCO₂e) and an appendix (749,553 tCO₂e); although the ratio is exactly 7× (consistent with annual vs. lifetime), the discrepancy was not explicitly reconciled in the documents.
  • CORSIA eligibility and CCP approval status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for wind

Baseline

Jurisdictional, no reassessment data

Safeguards

Mentioned, benefit sharing noted, details sparse

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents