Heilongjiang Keshanshuguang Wind Power Project
#776of 1935 in Renewable energy#388of 1084 in China#554of 1459 in CDM (UNFCCC)#605of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Heilongjiang, China, with a well-structured design: combined additionality test confirmed by DNV, a jurisdictional grid-emission-factor baseline, and a reasonable negligible-leakage justification. However, the available record contains only validation-era documents (2012) with no monitoring reports, no verified emission-reduction figures, and no CORSIA or CCP eligibility data, leaving the project's actual performance and market positioning unverified.
Red Flags
- No monitoring reports or verified emission-reduction figures are present in the extracted record, so actual performance over the 2012–2019 crediting period cannot be confirmed.
- The total emission-reduction figure differs between the validation report (107,079 tCO₂e) and an appendix (749,553 tCO₂e); although the ratio is exactly 7× (consistent with annual vs. lifetime), the discrepancy was not explicitly reconciled in the documents.
- CORSIA eligibility and CCP approval status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, justified for wind
Jurisdictional, no reassessment data
Mentioned, benefit sharing noted, details sparse
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →