Heilongjiang Mudanjiang Xiaoguokui Wind Power Project
#511of 1935 in Renewable energy#219of 1084 in China#337of 1459 in CDM (UNFCCC)#384of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and VVB-confirmed combined additionality test, but significant gaps in monitoring and verification data. The project's inherent low permanence risk (grid displacement) and appropriate 0% leakage treatment are positive, yet the absence of any verified emission reduction figures and monitoring reports limits confidence in actual delivery. Material findings from validation were resolved, but the overall evidence base remains thin.
Red Flags
- No monitoring reports or verification reports found in the extracted record — actual electricity generation and verified ERR figures are entirely absent
- Five CARs and six CLs raised during validation (2012) flagged ambiguities in monitoring methodology, common practice identification, and IRR calculation, indicating initial PDD quality concerns
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind displacement, no reversal risk
0% justified for grid feed-in
Jurisdictional grid EF (2010)
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →