A CDM biomass cogeneration project validated by DNV in 2012 using the simplified AMS-I.C. methodology, with a solid investment-test additionality assessment and all validation findings resolved. However, the available record contains only validation-stage documents with no monitoring reports or verified emission reductions, and a significant discrepancy exists between the PDD's claimed 99,253 tCO₂e and the VVB-validated 14,179 tCO₂e, limiting confidence in the project's actual delivery.
Red Flags
- Major discrepancy in total emission reductions: the PDD (2012-07-02) states 99,253 tCO₂e while the validation report (2012-07-19) validates only 14,179 tCO₂e — a roughly 7-fold difference that undermines confidence in the project's claimed impact.
- No buffer pool or permanence mechanism is stated in any available document, leaving reversal risk (e.g., plant decommissioning) unaddressed.
- No monitoring reports or verified emission reduction figures are present in the extracted record, making it impossible to confirm actual delivery against the validated baseline.
- Baseline method is contradictory across documents: the validation report describes a project-specific baseline while an appendix references a jurisdictional baseline.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test verified by DNV
mixed evidence / unresolved risk
0% deduction, deemed negligible — reasonable for biomass cog
Project-specific baseline; method contradicted in appendix
Safeguards mentioned but FPIC and grievance mechanism not do
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →