Heilongjiang Shaobaishan Wind Power Project
#460of 1935 in Renewable energy#187of 1084 in China#295of 1459 in CDM (UNFCCC)#348of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with VVB-confirmed additionality (combined test by DNV) and a 7-year crediting period, but the record is marred by a significant discrepancy in claimed emission reductions between two monitoring reports (45,451 vs 184,736 tCO₂e), a contradiction in baseline method classification, and the absence of a verification report or verified ERR figures. As an avoidance project, inherent permanence risk is low, but documentation gaps and data inconsistencies limit confidence in the credit's integrity.
Red Flags
- Claimed ERR figures differ by a factor of ~4 between the 2011 monitoring report (184,736) and the 2013 monitoring report (45,451), with no explanation provided in the extracted record
- Baseline method is classified as 'project' in the 2013 monitoring report but 'jurisdictional' in the 2009 validation report, creating ambiguity about the baseline construction
- No verification report appears in the evidence document list; only a validation report and two monitoring reports are available
- Total verified ERR is not stated in any available document, preventing independent confirmation of credit issuance
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 184,708 | 0 | 184,708 | |
| 2013 | 141,781 | 0 | 141,781 | |
| Total | 326,489 | 0 | 326,489 |
Risk Indicators
VVB-confirmed combined test (DNV)
Avoidance project, no reversal risk
0% deduction, quantified justification
Method contradiction (project vs jurisdictional)
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →