Heilongjiang Wanyuan Biomass Cogeneration Project
#216of 352 in Biomass#971of 1084 in China#1313of 1459 in CDM (UNFCCC)#71of 115 in AMS-I.C
Audit Analysis
A CDM biomass cogeneration project validated by DNV in 2012 with a confirmed investment additionality test, but the available record is limited to the validation phase with no monitoring reports or verified emission reductions. A seven-fold discrepancy between the PDD and validation report on total claimed reductions, combined with a project-specific baseline and zero leakage deduction, raises meaningful data-reliability and over-crediting concerns.
Red Flags
- Total ERR in the PDD (313,243 tCO₂e) is roughly seven times the figure in the validation report (44,749 tCO₂e), indicating a major inconsistency in the project's claimed reductions.
- No buffer pool or permanence mechanism is documented, and no reversal-event data is available for this biomass project.
- No monitoring reports or verified emission reductions are present in the extracted record; the project's actual performance is unconfirmed.
- Leakage is set at 0% with a 'deemed negligible' justification, yet an appendix document references a quantified leakage treatment, creating an unresolved contradiction.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, contradictory appendix
Project-specific baseline
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →