Heilongjiang Wuding Mountain Wind Power Project
#1261of 1935 in Renewable energy#751of 1084 in China#990of 1459 in CDM (UNFCCC)#980of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Heilongjiang, China, with a standard jurisdictional grid-emission-factor baseline and VVB-confirmed investment additionality. However, a seven-fold discrepancy in the claimed emission reduction figure between the PDD and the validation report, combined with the absence of any monitoring reports and low document-extraction confidence, significantly undermines confidence in the project's actual credit volume and data reliability.
Red Flags
- Seven-fold discrepancy in total ERR: the PDD (2012-09-28) claims 677,075 tCO2e while the validation report (2012-10-31) states 96,897 tCO2e — a 7× gap that raises serious over-crediting risk if the PDD figure was used for registration
- No monitoring reports found in the extracted record; the full 7-year crediting period (2013–2019) has no verifiable performance data
- Low extraction confidence in the document parsing, meaning key fields (FNRB, usage monitoring, buffer pool, CORSIA/CCP status) could not be confirmed
- Additionality test type contradicts between documents: PDD states 'combined' while the validation report states 'investment'
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% with negligible justification
Jurisdictional grid EF (2011)
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →