Heilongjiang Xiaobaishan Wind Power Project
#965of 1935 in Renewable energy#520of 1084 in China#708of 1459 in CDM (UNFCCC)#759of 1287 in ACM0002
Audit Analysis
A CDM wind power project with a solid jurisdictional baseline and VVB-confirmed combined additionality test, but severely limited by the absence of any monitoring data, a seven-fold discrepancy in claimed emissions reductions between the PDD and validation report, and no post-validation verification. The project is past its 2019 crediting period with no evidence of verified credits issued.
Red Flags
- Seven-fold discrepancy in total ERR: the PDD (March 2012) states 758,359 tCO2e while the validation report (May 2012) confirms only 108,337 tCO2e — a data reliability issue that undermines confidence in the project's quantification
- No monitoring report or verified ERR figure found in any available document; the project's actual credit issuance cannot be confirmed
- Grid emission factor contradiction: 0.9636 (validation report) vs 1.0852 (appendix) — the higher value in the earlier appendix could inflate baseline emissions if used in calculations
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Wind – no biogenic reversal risk
0% – negligible for grid wind
Jurisdictional, 2011 grid EF
Mentioned but FPIC/grievance not documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →