Heilongjiang Yilan Jiguanshan Phase II Wind Farm Project
#266of 1935 in Renewable energy#100of 1084 in China#168of 1459 in CDM (UNFCCC)#196of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a solid combined additionality test verified by BVCH and a standard jurisdictional grid baseline. However, the absence of any monitoring or verification data in the available record prevents confirmation of actual delivery, and the validation report recorded four corrective actions and seven comments that, while resolved, indicate initial submission quality gaps. The project is a conventional renewable-energy displacement with no reversal risk, but the documentation trail is limited to the validation phase.
Red Flags
- No monitoring reports or verification reports are present in the extracted record; actual emissions reductions cannot be confirmed against the 787,122 tCO2e lifetime claim.
- Four corrective actions in the validation report included missing original Letters of Approval from both the Chinese and UK DNAs and an IRR calculation error where the operating fund was not fully recovered, indicating initial financial and regulatory documentation gaps.
- A contradiction exists on leakage treatment: the validation report characterises it as 'deemed negligible' while an appendix references a 'quantified' approach, creating ambiguity about whether a formal quantification was performed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-verified
Avoidance project, no reversals
0% negligible, minor doc contradiction
Jurisdictional grid EF, standard
Mentioned, benefit sharing noted, no FPIC/grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →