Heilongjiang Yilan Yunling Wind Power Project

CDM-5178 ↗

#863of 1935 in Renewable energy#452of 1084 in China#617of 1459 in CDM (UNFCCC)#677of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A CDM wind power project in China with a VVB-confirmed combined additionality test and an appropriate grid-based baseline, but undermined by four material findings requiring corrective action in the PDD's financial analysis, a leakage assessment that was ultimately not addressed, and a significant discrepancy between the ex-ante ERR estimate (119,838 tCO₂e) and the figure reported in the monitoring period (75,112 tCO₂e). The project is inherently low-risk for reversal given its avoidance nature, but documentation gaps and unresolved contradictions limit confidence in the credit quantity.

Red Flags

  • Four material findings (CARs) in the validation report indicate errors in the PDD's financial analysis, including an incorrect emission factor tool version, a misdescription of electricity imports between grid regions, an omitted interest component in the IRR calculation, and an operating cost inconsistency with the approved FSR
  • Leakage justification is recorded as 'not addressed' in the later monitoring report (June 2013), contradicting an earlier monitoring report (August 2012) that described it as 'quantified' — the 0% leakage deduction lacks a documented rationale
  • The total ERR claimed differs substantially between the validation report (119,838 tCO₂e) and the monitoring report (75,112 tCO₂e), a discrepancy of roughly 37% that is not explained in the available documents
  • No verified ERR figure (total_err_verified) was found in any available document, making it impossible to confirm actual delivery against the ex-ante estimate

Credit Vintages

IssuedRetiredAvailable
2013
109,9180109,918
Total109,9180109,918

Risk Indicators

Additionality

VVB-confirmed but 4 CARs in financial analysis

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification not addressed

Baseline

Jurisdictional grid baseline, appropriate for wind

Safeguards

Safeguards mentioned, FPIC and grievance mechanism not docum

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents