Heilongjiang Youyi Biomass Power Generation Project

CDM-4055 ↗

#135of 352 in Biomass#752of 1084 in China#991of 1459 in CDM (UNFCCC)#21of 81 in ACM0006

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A CDM biomass power generation project with a VVB-verified combined additionality test and an established methodology (ACM0006 v09), but significant evidence gaps including no verified ERR figures, no monitoring period data, and two unresolved contradictions between the validation report and an appendix regarding leakage treatment and baseline method. The low extraction confidence and absence of monitoring reports limit the ability to confirm actual delivery against the 992,425 tCO2e lifetime claim.

Red Flags

  • Contradiction between validation report (leakage 'deemed negligible') and appendix (leakage 'quantified') undermines confidence in the 0% leakage deduction
  • Contradiction between validation report (project-specific baseline) and appendix (jurisdictional baseline) creates uncertainty about the robustness of the baseline
  • No verified ERR or monitoring period data available in the extracted record, preventing any pro-rata delivery check against the 992,425 tCO2e lifetime claim
  • Low extraction confidence indicates at least one key document was poorly readable, reducing reliability of all extracted facts
  • Feedstock sustainability, carbon content testing, and LCA data are entirely absent from the record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified combined test

Permanence

lower risk for energy project

Leakage

0% deduction contradicted by appendix

Baseline

Project-specific; contradicted by appendix

Safeguards

Mentioned but FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents