Skip to main content
CDMWindChinaACM0002

Heilongjiang Yunwushan Wind Power Project

CDM-6215 ↗

#1321of 1935 in Renewable energy#801of 1084 in China#1049of 1459 in CDM (UNFCCC)#1025of 1287 in ACM0002

4.7/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
6.0
Documentation
3.5

Audit Analysis

A CDM wind power project in China validated by DNV in 2012 with a sound investment-test additionality assessment and jurisdictional baseline, but the available record is thin: no monitoring reports, no verified emission reductions, and low extraction confidence. Seven material findings at validation—including missing Letters of Approval, an Annex I Party inconsistency, and a non-conservative emission-factor calculation—lower confidence in the integrity of the underlying data, even though corrective actions were required.

Red Flags

  • Seven material findings at validation, including missing Letters of Approval from China and the Annex I Party (CAR 1) and an inconsistency in Annex I Party identification between the PDD (Netherlands) and the LoA (France) (CAR 2)
  • The validation report flagged that the combined-margin CO₂ emission factor calculation was not conservative (CL 5), raising over-crediting risk
  • No monitoring reports or verified emission-reduction figures found in the extracted record; total ERR verified is not stated
  • Low extraction confidence across the document set, with one document of unknown type, limiting the reliability of the available evidence

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind – no reversal risk

Leakage

0 % – negligible for grid wind

Baseline

Jurisdictional grid EF (2011)

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents