Audit Analysis
The Heishan Yangtun Wind Power Project is a CDM-registered wind avoidance project with a solid jurisdictional baseline and VVB-confirmed combined additionality test. However, a seven-fold discrepancy between the PDD and validation report on total emissions reductions, the absence of any monitoring-period data, and the lack of CORSIA/CCP status information limit confidence in the project's ongoing transparency and claim safety.
Red Flags
- Total ERR in the PDD (755,314 tCO2) is approximately 7× the validated figure in the validation report (107,902 tCO2), indicating a major initial over-estimation that was only corrected during validation
- No monitoring reports or verified ERR figures are available in the extracted record, leaving the project's actual performance unverified
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% with negligible justification
Jurisdictional grid-EF baseline
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.