Heishan Yangtun Wind Power Project

CDM-6468 ↗

#561of 1935 in Renewable energy#263of 1084 in China#381of 1459 in CDM (UNFCCC)#431of 1287 in ACM0002

5.7/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Heishan Yangtun Wind Power Project is a CDM-registered wind avoidance project with a solid jurisdictional baseline and VVB-confirmed combined additionality test. However, a seven-fold discrepancy between the PDD and validation report on total emissions reductions, the absence of any monitoring-period data, and the lack of CORSIA/CCP status information limit confidence in the project's ongoing transparency and claim safety.

Red Flags

  • Total ERR in the PDD (755,314 tCO2) is approximately 7× the validated figure in the validation report (107,902 tCO2), indicating a major initial over-estimation that was only corrected during validation
  • No monitoring reports or verified ERR figures are available in the extracted record, leaving the project's actual performance unverified
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% with negligible justification

Baseline

Jurisdictional grid-EF baseline

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents