Hekou 23MW Hydropower Project
#1035of 1935 in Renewable energy#574of 1084 in China#771of 1459 in CDM (UNFCCC)#816of 1287 in ACM0002
Audit Analysis
The Hekou 23MW Hydropower Project is a CDM-registered renewable energy project with VVB-confirmed additionality and a reasonable leakage treatment, but is undermined by a baseline method contradiction between the PDD and validation report, five material findings at validation, and the absence of a buffer pool or monitoring-period detail. The exact match between claimed and verified ERR is reassuring against over-crediting, yet the project-specific baseline (per the VVB) and missing F-NRB documentation limit confidence in the quantification.
Red Flags
- Baseline method contradiction: the PDD (Nov 2010) describes a jurisdictional baseline while the validation report (Mar 2011) records a project-specific baseline; the VVB's more recent assessment is privileged, but the discrepancy signals documentation inconsistency.
- Five material findings at validation (LoA from Annex-I country, project start-date validation, timeline consistency, IRR calculation, monitoring frequency) indicate initial additionality and monitoring documentation was incomplete.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified despite the absence of reported reversal events.
- No monitoring period is stated in the extracted record, making it impossible to confirm the temporal scope of the verified ERR figure.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
no reversals reported
0% deemed negligible, consistent with hydro
Contradiction: project vs jurisdictional; VVB says project-s
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →