Hemagiri Mini Hydel Project in Karnataka State, India
#967of 1935 in Renewable energy#483of 975 in India#710of 1459 in CDM (UNFCCC)#313of 806 in AMS-I.D
Audit Analysis
The Hemagiri Mini Hydel Project is a methodologically sound CDM hydro project with a VVB-confirmed investment additionality test and a jurisdictional baseline, but the available record contains no monitoring data, a ten-fold discrepancy in claimed emissions reductions between the PDD and validation report, and low extraction confidence across the document set. The project's core design is credible, yet the absence of verified performance data and the ERR contradiction limit confidence in the actual credit volume.
Red Flags
- Ten-fold discrepancy in total claimed emissions reductions: the PDD states 88,490 tCO₂e while the validation report states 8,849 tCO₂e over the same crediting period — a factor-of-10 error that undermines data reliability
- No monitoring reports or verified emissions reductions found in the extracted record; the project's crediting period (2010–2020) has fully elapsed with no performance data available
- Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
hydro is inherently stable
0% deduction, deemed negligible — appropriate for mini hydel
Jurisdictional grid EF (854.7 kgCO₂/kWh, 2007)
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →