Henan Biyang Zhongtian Wind Power Project
#512of 1935 in Renewable energy#221of 1084 in China#339of 1459 in CDM (UNFCCC)#386of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline. The project is inherently low-risk for reversal (avoidance of grid electricity), but the available record is limited to the validation phase with no monitoring reports, and a significant 7× discrepancy in claimed emissions reductions between the PDD and the validation report raises initial-claim reliability concerns.
Red Flags
- The PDD claimed 592,977 tCO₂e while the validation report validated only 84,711 tCO₂e — a 7× overstatement in the project proponent's initial submission, corrected by the VVB but indicative of weak initial modelling.
- No monitoring reports or verified emissions reductions are available in the extracted record, so actual delivery against the validated baseline cannot be assessed.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for grid-connected wind
Jurisdictional grid EF (0.87705, 2011)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →