Skip to main content
CDMWindChinaACM0002

Henan Biyang Zhongtian Wind Power Project

CDM-6015 ↗

#512of 1935 in Renewable energy#221of 1084 in China#339of 1459 in CDM (UNFCCC)#386of 1287 in ACM0002

5.8/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A CDM wind power project in China with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline. The project is inherently low-risk for reversal (avoidance of grid electricity), but the available record is limited to the validation phase with no monitoring reports, and a significant 7× discrepancy in claimed emissions reductions between the PDD and the validation report raises initial-claim reliability concerns.

Red Flags

  • The PDD claimed 592,977 tCO₂e while the validation report validated only 84,711 tCO₂e — a 7× overstatement in the project proponent's initial submission, corrected by the VVB but indicative of weak initial modelling.
  • No monitoring reports or verified emissions reductions are available in the extracted record, so actual delivery against the validated baseline cannot be assessed.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, reasonable for grid-connected wind

Baseline

Jurisdictional grid EF (0.87705, 2011)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents