Henan Dengzhou Biomass cogeneration Project
#117of 352 in Biomass#690of 1084 in China#904of 1459 in CDM (UNFCCC)#19of 81 in ACM0006
Audit Analysis
A CDM biomass cogeneration project in Henan, China with a confirmed investment-test additionality and an established methodology (ACM0006 v14.0), but undermined by a seven-fold discrepancy in reported emission reductions between the validation report and an appendix, a contradictory leakage treatment, and a low-confidence document extraction that limits verifiability. The project is at the validation stage with no monitoring or verification reports available, making ongoing performance assessment impossible.
Red Flags
- Seven-fold ERR discrepancy: the validation report states 77,483 tCO₂e while an appendix lists 542,381 tCO₂e — a factor-of-7 gap that cannot be reconciled from available documents
- Leakage treatment is contradictory: the validation report records a 0% deduction as 'deemed negligible' while an appendix describes leakage as 'quantified', leaving the actual treatment unclear
- Low extraction confidence across the document set, with one of four source documents of unknown type, limiting the reliability of all extracted figures
- No monitoring or verification reports are present in the evidence set; only the 2019 validation-stage documents are available, so no post-issuance performance data can be assessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 121,625 | 0 | 121,625 | |
| Total | 121,625 | 0 | 121,625 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, contradictory justification
Project-specific, set at validation 2019
Mentioned, benefit sharing described, no FPIC or grievance m
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →