Skip to main content
CDMBiomass EnergyChinaACM0006

Henan Dengzhou Biomass cogeneration Project

CDM-5514 ↗

#117of 352 in Biomass#690of 1084 in China#904of 1459 in CDM (UNFCCC)#19of 81 in ACM0006

4.9/ 10
Integrity
6.0
Transparency
4.5
Claim Safety
4.8
Documentation
3.5

Audit Analysis

A CDM biomass cogeneration project in Henan, China with a confirmed investment-test additionality and an established methodology (ACM0006 v14.0), but undermined by a seven-fold discrepancy in reported emission reductions between the validation report and an appendix, a contradictory leakage treatment, and a low-confidence document extraction that limits verifiability. The project is at the validation stage with no monitoring or verification reports available, making ongoing performance assessment impossible.

Red Flags

  • Seven-fold ERR discrepancy: the validation report states 77,483 tCO₂e while an appendix lists 542,381 tCO₂e — a factor-of-7 gap that cannot be reconciled from available documents
  • Leakage treatment is contradictory: the validation report records a 0% deduction as 'deemed negligible' while an appendix describes leakage as 'quantified', leaving the actual treatment unclear
  • Low extraction confidence across the document set, with one of four source documents of unknown type, limiting the reliability of all extracted figures
  • No monitoring or verification reports are present in the evidence set; only the 2019 validation-stage documents are available, so no post-issuance performance data can be assessed

Credit Vintages

IssuedRetiredAvailable
2014
121,6250121,625
Total121,6250121,625

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, set at validation 2019

Safeguards

Mentioned, benefit sharing described, no FPIC or grievance m

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents