Skip to main content
CDMBiomass EnergyChinaACM0006

Henan Lankao Biomass Cogeneration Project

CDM-7447 ↗

#27of 352 in Biomass#223of 1084 in China#341of 1459 in CDM (UNFCCC)#6of 81 in ACM0006

5.8/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

The Henan Lankao Biomass Cogeneration Project is a CDM-registered biomass energy project with a solid validation record, including a VVB-confirmed combined additionality test and a reasonable 0% leakage deduction for a grid-displacement project. However, the absence of any monitoring report data, a project-specific baseline, and several unresolved documentation gaps limit confidence in actual performance and long-term integrity.

Red Flags

  • No monitoring report or verified emission reduction figures found in the extracted record — actual performance cannot be confirmed
  • Baseline method is project-specific per the validation report, though an appendix references a jurisdictional baseline, creating ambiguity
  • Nine Corrective Action Requests were raised during validation (all closed), indicating initial PDD quality issues
  • No buffer pool, permanence mechanism, or reversal-risk assessment documented (though reversal risk is inherently low for a biomass energy project)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test; investment infeasibility withou

Permanence

Biomass energy project — no carbon storage, inherently low r

Leakage

0% deduction, deemed negligible; reasonable for grid-displac

Baseline

Project-specific baseline; no reassessment date recorded; ap

Safeguards

Safeguards mentioned and benefit-sharing described, but FPIC

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents