Henan Nanjie Biomass Cogeneration Project
#136of 352 in Biomass#753of 1084 in China#992of 1459 in CDM (UNFCCC)#22of 81 in ACM0006
Audit Analysis
The Henan Nanjie Biomass Cogeneration Project is a CDM-registered biomass energy project with VVB-confirmed additionality and a recognized methodology (ACM0006 v11.2.0), but the available record is limited to a validation report and PDD with no monitoring data, low extraction confidence, and several unresolved gaps in feedstock sustainability, leakage justification, and baseline reassessment. The project's avoidance-based design (displacing grid electricity) limits permanence risk, yet the project-specific baseline and 0% leakage deduction with minimal justification introduce moderate over-crediting uncertainty.
Red Flags
- No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to confirm actual delivery against the 1,167,292 tCO₂e lifetime claim
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for a biomass project where displaced fuel or alternative uses of feedstock could constitute leakage
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, undermining reliability of the extracted data
- Feedstock sustainability and carbon content testing are not stated in any available document, leaving the biomass supply chain unverified
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, minimal justification
Project-specific, no reassessment data
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →