Skip to main content
CDMSolarChinaAMS-I.C

Henan Nanzhao Solar Cooker Project

CDM-6668 ↗

#93of 150 in Cookstoves#804of 1084 in China#1050of 1459 in CDM (UNFCCC)#46of 115 in AMS-I.C

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The Henan Nanzhao Solar Cooker Project has a solid additionality foundation (VVB-verified investment test under AMS-I.C.) and a reasonable leakage treatment, but suffers from a critical 10× discrepancy in claimed emissions reductions between the PDD and validation report, a complete absence of verified monitoring data across its 10-year period, and a project-specific baseline with no documented permanence risk mitigation. The low extraction confidence on source documents further limits confidence in the available evidence.

Red Flags

  • Total ERR differs by a factor of 10 between the PDD (939,620 tCO₂e) and the validation report (93,962 tCO₂e), raising serious data-reliability questions
  • No verified ERR figures found for the entire 2012–2021 monitoring period despite a 10-year crediting window
  • No buffer pool, permanence mechanism, or reversal-risk mitigation documented for a project whose credits depend on continued cooker use
  • Low extraction confidence on at least one key source document, limiting the reliability of the extracted record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test (AMS-I.C.)

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible with justification

Baseline

Project-specific, no reassessment recorded

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-I.C.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents