Skip to main content
CDMSolarChinaAMS-I.C

Henan Sheqi Solar Cooker Project

CDM-6665 ↗

#121of 150 in Cookstoves#943of 1084 in China#1259of 1459 in CDM (UNFCCC)#63of 115 in AMS-I.C

4.3/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

The Henan Sheqi Solar Cooker Project has a solid additionality foundation (VVB-verified investment test) and a reasonable leakage position for its technology, but suffers from significant data gaps: no monitoring or verification reports are available, the claimed ERR figure is contradicted by a 10× discrepancy between the validation report and the PDD, and extraction confidence is low. The project's claims cannot be independently verified against actual performance data.

Red Flags

  • ERR discrepancy: the validation report (Jul 2012) states 84,566 tCO2 while the PDD (Jun 2012) states 845,660 tCO2 — a factor-of-10 difference that undermines confidence in the project's quantification
  • No monitoring or verification reports found in the extracted record; total verified ERR and monitoring period are entirely absent
  • Five material findings in the validation report, including an inconsistency in the number of townships (8 vs 15, corrected to 14), indicating data-quality issues at validation
  • Four corrective actions were required at validation (LOA from DNA, modalities of communication, township count correction, methodology update), suggesting the project was not fully compliant at the time of validation

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Project-specific, no reassessment date

Safeguards

Safeguards mentioned, FPIC and grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-I.C.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents