Henan Tanghe Solar Cooker Project
#133of 150 in Cookstoves#997of 1084 in China#1341of 1459 in CDM (UNFCCC)#75of 115 in AMS-I.C
Audit Analysis
The Henan Tanghe Solar Cooker Project has a confirmed investment-test additionality assessment by TÜV Rheinland and uses a standardized CDM methodology (AMS-I.C. v19.0), but suffers from a critical 10× discrepancy in claimed emissions reductions between the PDD and the validation report, a project-specific baseline with no reassessment data, and a complete absence of monitoring or verified-credit data. The low extraction confidence and limited documentary record further undermine confidence in the project's data integrity.
Red Flags
- 10× discrepancy in total claimed ERR: the PDD (June 2012) states 939,620 tCO₂e while the validation report (July 2012) states 93,962 tCO₂e — a factor-of-ten difference that raises serious data-reliability concerns
- No monitoring reports, verified credit figures, or monitoring-period data found in any available document despite the crediting period (2013–2022) having fully elapsed
- Five material findings in the validation report, including an inconsistency in the number of townships (8 vs 19) and unresolved questions on thermal-efficiency maintenance and cooker re-allocation procedures
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, in a project where users could revert to biomass or grid cooking
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
lower inherent risk for cookers
0% deduction, 'deemed negligible' only
Project-specific, no reassessment recorded
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →