Henan Xinxiang 24MW Biomass Based Cogeneration Project

VCS-1140 ↗

5.6 / 10
Integrity
5.4
Transparency
6.2
Claim Safety
5.1
Documentation
6.0

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB and the project applies ACM0006 with a stated grid emission factor of 0.9735.

missing Baseline is project-specific and key elements show reliability issues (crediting period inconsistency; multiple corrective actions; leakage narrative conflicts).

Transparency

verified Monitoring period is clearly stated (2018-01-01 to 2021-07-31) and the VVB is identified (TÜV Rheinland (China) Ltd.).

missing Reported verified ERs and safeguards information conflict across documents, reducing MRV clarity and comparability.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk.

missing Contradictory verified ER totals and inconsistent leakage/safeguards statements increase greenwashing and over-crediting risk.

Documentation

verified A relatively large document set was extracted (19 documents including PDD, monitoring, validation, issuance) with high extraction confidence.

missing Multiple corrective actions are listed (including missing tool references and several CARs), indicating documentation quality/control gaps.

Detailed Analysis

Integrity

The monitoring documentation states additionality was confirmed by the VVB and describes a combined additionality approach, while the 2011 validation report frames additionality as an investment test; this inconsistency weakens confidence in the additionality narrative even if VVB confirmation is present. The baseline is described as project-specific, and the timing of baseline reassessment is not stated in the extracted record. Leakage is treated as 0% with a quantified justification in a 2021 monitoring report, but another 2021 monitoring report describes leakage as deemed negligible, which raises questions about methodological consistency. No material findings are reported, but the presence of multiple corrective actions/CARs suggests non-trivial issues were identified during review.

Transparency

The monitoring period (2018-01-01 to 2021-07-31) and the VVB (TÜV Rheinland (China) Ltd.) are clearly identified in the monitoring report (2021-10-13). However, the extracted record shows a major inconsistency in the verified ER total across 2021 validation documents, which undermines transparency on what was actually verified. Key MRV-related items such as grid EF vintage and usage monitoring method are not stated in the extracted record, limiting traceability of calculations beyond the single grid EF value provided.

Claim Safety

CORSIA eligibility is explicitly stated as false, which reduces the risk of dual-channel claims in aviation. Nonetheless, the contradiction in verified ER totals across 2021 validation documents (309,352 vs 454,707) is a direct over-crediting/claims risk because it is unclear which quantity is authoritative. Leakage is reported as 0% but with conflicting rationales (quantified vs deemed negligible), which increases the risk that stakeholders perceive the accounting as selectively presented.

Documentation

The evidence set includes PDD, monitoring report(s), validation report(s), and issuance records, with 19 documents used and high extraction confidence, supporting a mid-to-strong documentation score. At the same time, the monitoring documentation lists multiple corrective actions (including missing tool references and several CARs), indicating that key elements were incomplete or required correction during the process. Several safeguards-related fields also vary across older (2013) and newer (2021) monitoring documentation, suggesting uneven documentation practices over time.

Overall

Several contradictions materially affect confidence: (1) for leakage justification, the more recent monitoring report (2021-10-13) stating leakage was quantified is privileged over the earlier 2021-08-24 monitoring report stating it was deemed negligible, but the inconsistency still reduces integrity/claim-safety. (2) For safeguards, grievance mechanism, benefit sharing, and FPIC, the 2021-10-13 monitoring report is privileged over the 2013-08-30 monitoring report because it is more recent, yet the shift without clear continuity documentation lowers transparency. (3) For additionality test type, the 2011 validation report’s investment-test framing is treated as more authoritative for the original additionality demonstration, while the 2021 monitoring report’s “combined” label is treated as later characterization; this mismatch reduces integrity. (4) For verified ERs, the 2021-10-20 validation report value (309,352) is privileged over the 2021-08-27 value (454,707) because it is later, but the discrepancy is large and drives a meaningful score penalty. (5) For crediting period, the validation report (2021-10-20) start date of 2019 is privileged over the monitoring report’s 2009 start date because crediting period definition is typically anchored in validation/registration documentation; this contradiction also reduces reliability.

Audit Analysis

The project is VVB-assessed under ACM0006 and reports no material findings, but several internal inconsistencies across documents (including crediting period, additionality framing, and verified ERs) weaken confidence in the underlying record. Leakage is reported as 0% with conflicting narratives, and multiple corrective actions indicate documentation/control weaknesses even if ultimately resolved.

Project Description

The Henan Xinxiang Biomass based Cogeneration Project generates electricity and heat using biomass residues, resulting in a reduction of GHG emissions. By avoiding the dumping of these residues, the project also reduces CH4 emissions. This project is estimated to achieve 123,858 tCO2e emission reductions annually.

Red Flags

  • Conflicting verified ER figures across 2021 validation documents (309,352 vs 454,707) create over-crediting and reliability risk.
  • Crediting period start date is inconsistent between the monitoring report (2009) and a 2021 validation report (2019).
  • Safeguards/FPIC/grievance/benefit-sharing are inconsistently reported between 2013 and 2021 monitoring documentation.

Credit Vintages

Issued Retired Available
2009
80,804 0 80,804
2010
73,034 12,500 60,534
2013
25,116 848 24,268
2014
17,142 17,142 0
2015
9,386 9,386 0
2016
10,003 10,003 0
2017
17,179 17,179 0
2018
119,200 20,264 98,936
2019
89,989 9,039 80,950
2020
65,314 11,103 54,211
2021
34,849 1,091 33,758
Total 542,016 108,555 433,461

Cosa migliorerebbe questo punteggio

  • Publish/clarify a single authoritative verified ER figure for the monitoring period with a clear reconciliation note explaining why earlier validation numbers differed.
  • Provide a consolidated safeguards package (FPIC evidence, grievance mechanism procedures, benefit-sharing description) showing continuity from early monitoring to the latest period, and explicitly document leakage assessment approach (quantified vs negligible) under ACM0006.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but inconsistent test description

Permanence

No reversal risk indicated for biomass energy; no reversals reported

Leakage

0% leakage with conflicting justification

Baseline

Project-specific baseline; reassessment timing not evidenced

Safeguards

Safeguards/FPIC and grievance inconsistently documented over time

Double-claim

Not CORSIA-eligible; CCP status not evidenced

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti