Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Mauritius Registry: RegisteredACM0002

Henrietta solar PV project

VCS-2309 ↗

#994of 1935 in Renewable energy#636of 1339 in Verra (VCS)#784of 1287 in ACM0002

5.1/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.0

Audit Analysis

The Henrietta Solar PV project in Mauritius is a straightforward renewable energy project under VCS methodology ACM0002, with additionality confirmed by a reputable VVB (APPLUS+ Certification) and no reversal events. However, the project suffers from notable data-quality issues: multiple corrective actions were raised during verification, the leakage treatment is marked as 'not addressed' in the most recent verification report, and the additionality test type is not specified. The ERR discrepancy between the monitoring report (18,771 tCO2) and the verification report (21,790 tCO2) further undermines confidence in the monitoring data.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2026 verification report, while the earlier 2024 verification report stated it was 'quantified' — a regression in documentation quality
  • ERR discrepancy: the monitoring report (Oct 2024) reported 18,771 tCO2 while the verification report (Jan 2026) verified 21,790 tCO2 — a 16% increase during verification is unusual and suggests the monitoring data contained undercounting errors
  • Six or more corrective actions (CARs) were raised, including blank cells in the ER spreadsheet, inconsistent monitoring period dates, and use of an outdated MR template version
  • Additionality test type is not stated in any available document, despite the VVB confirming additionality

Credit Vintages

IssuedRetiredAvailable
2019
17,48517,4850
2020
25,1083,00022,108
2021
27,3261,01426,312
2022
26,741026,741
2023
20,737020,737
2024
6,39406,394
Total123,79121,499102,292

Risk Indicators

Additionality

VVB-confirmed but test type not specified

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification 'not addressed'

Baseline

Project-specific, not yet due for reassessment

Safeguards

FPIC, grievance mechanism, and safeguards documented

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents