Heqing County Liuhe 30MW Hydropower Plant
#314of 1935 in Renewable energy#121of 1084 in China#204of 1459 in CDM (UNFCCC)#235of 1287 in ACM0002
Audit Analysis
A 30 MW small-scale hydropower project in China registered under CDM with a combined additionality test confirmed by TÜV Nord. The project shows reasonable design for its type, but four contradictions between the validation and monitoring reports—particularly on baseline method and leakage justification—introduce uncertainty. Several key monitoring parameters remain unreported, limiting full verification of credit delivery.
Red Flags
- Baseline method is characterised as 'project' in the monitoring report but 'jurisdictional' in the validation report; for ACM0002 the baseline should be the grid emission factor, so the monitoring report's characterisation is inconsistent with the methodology
- Leakage justification is contradictory: the validation report (2010) states leakage was deemed negligible, while the monitoring report (2011) states it was quantified, yet the deduction is 0% in both cases
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified despite the absence of a stated reversal mechanism
- Total verified ERR for the monitoring period is not reported (field is empty), preventing independent confirmation of credit delivery
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by TÜV Nord
low inherent risk for hydro
0% deduction with contradictory justification
Grid EF used but method characterisation inconsistent
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →