Skip to main content
GSBiogas - HeatChinaAMS-III.R

Hezhang Rural Methane Digesters Project in Guizhou Province

GS-449 ↗ · current registry ID: GS2640

#134of 268 in Biogas#757of 1084 in China#1070of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.2
Claim Safety
5.0
Documentation
4.8

Audit Analysis

A Gold Standard rural biogas project in Guizhou with VVB-confirmed additionality but significant documentation and compliance weaknesses, including seven corrective actions, a project-specific modeled baseline, contradictory leakage justifications across verification reports, and no FPIC conducted. The verified emissions reductions are broadly consistent with the pro-rata ex-ante expectation (~98%), but the ERR figures differ materially between the 2017 and 2019 verification reports, and several key parameters (FNRB, buffer pool, CORSIA/CCP status) are absent from the record.

Red Flags

  • Seven corrective actions were required in the 2019 verification report, including non-compliant GWP for methane, an invalid methodology version at registration, and an unreported stakeholder feedback round
  • FPIC was not conducted for a rural community project, and the 2019 verification report notes stakeholder feedback round outcomes were not reported in the Passport
  • Leakage justification is contradictory: the 2019 verification report states leakage was 'quantified' while the 2017 verification report states it was 'deemed negligible', yet the deduction is 0% in both cases
  • Total ERR figures differ by nearly a factor of two between the 2017 report (183,706 tCO₂e) and the 2019 report (98,187 tCO₂e), with no clear explanation in the extracted record

Credit Vintages

IssuedRetiredAvailable
2013
33,99833,9980
2014
49,81649,8160
2015
49,84149,8410
2016
50,05140,05110,000
2017
48,54648,5460
2018
49,64149,62714
Total281,893271,87910,014

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project

Leakage

0% deduction; contradictory justification across reports

Baseline

Project-specific, modeled; reassessment date not stated

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05AMS-III.R, AMS-I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents