Hezhang Rural Methane Digesters Project in Guizhou Province
GS-449 ↗ · current registry ID: GS2640
#134of 268 in Biogas#757of 1084 in China#1070of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard rural biogas project in Guizhou with VVB-confirmed additionality but significant documentation and compliance weaknesses, including seven corrective actions, a project-specific modeled baseline, contradictory leakage justifications across verification reports, and no FPIC conducted. The verified emissions reductions are broadly consistent with the pro-rata ex-ante expectation (~98%), but the ERR figures differ materially between the 2017 and 2019 verification reports, and several key parameters (FNRB, buffer pool, CORSIA/CCP status) are absent from the record.
Red Flags
- Seven corrective actions were required in the 2019 verification report, including non-compliant GWP for methane, an invalid methodology version at registration, and an unreported stakeholder feedback round
- FPIC was not conducted for a rural community project, and the 2019 verification report notes stakeholder feedback round outcomes were not reported in the Passport
- Leakage justification is contradictory: the 2019 verification report states leakage was 'quantified' while the 2017 verification report states it was 'deemed negligible', yet the deduction is 0% in both cases
- Total ERR figures differ by nearly a factor of two between the 2017 report (183,706 tCO₂e) and the 2019 report (98,187 tCO₂e), with no clear explanation in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 33,998 | 33,998 | 0 | |
| 2014 | 49,816 | 49,816 | 0 | |
| 2015 | 49,841 | 49,841 | 0 | |
| 2016 | 50,051 | 40,051 | 10,000 | |
| 2017 | 48,546 | 48,546 | 0 | |
| 2018 | 49,641 | 49,627 | 14 | |
| Total | 281,893 | 271,879 | 10,014 |
Risk Indicators
VVB-confirmed combined test
Avoidance project
0% deduction; contradictory justification across reports
Project-specific, modeled; reassessment date not stated
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →