Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Hifadhi Improved cook-stoves in Embu County, Kenya

GS-508 ↗ · current registry ID: GS2898

#3of 1329 in Industrial#1of 157 in Kenya#24of 1801 in Gold Standard (GS)

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A long-running Gold Standard cookstove project (2013–2023) with VVB-confirmed additionality, locally measured FNRB, and quantified leakage deductions. The verified ERR for the short monitoring window (71,984 tCO₂e) exceeds the pro-rata lifetime expectation by roughly 41%, indicating conservative ex-ante assumptions. Key gaps include the absence of a stated buffer pool, a project-specific baseline last reassessed in 2014, and unconfirmed CORSIA/CCP status.

Red Flags

  • The PDD (2014) characterises leakage as 'deemed negligible' while the 2024 verification report quantifies it at 148 tCO₂e (transport, repairs, secondary stove); the earlier PDD language is inconsistent with the project's actual leakage profile.
  • FPIC (Free, Prior and Informed Consent) is not documented in the extracted record, despite the project distributing stoves to rural households in Embu County.
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2013
26,31325,707606
2014
85,96984,0161,953
2015
150,485146,8393,646
2016
218,553213,8724,681
2017
260,968229,29731,671
2018
238,056207,10130,955
2019
245,977189,77556,202
2020
246,992154,84392,149
2021
259,19194,053165,138
2022
257,79154,863202,928
2023
71,9847,71064,274
Total2,062,2791,408,076654,203

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

reversal risk unquantified

Leakage

Quantified at 148 tCO₂e with itemised deductions

Baseline

Project-specific; last reassessed 2014

Safeguards

Grievance mechanism and benefit sharing present; FPIC not documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents